
I'm not doing any major sewing today, just working on some monthly things I have on my Big 3 list.I make a list at the beginning of the month with at least 3 things that I need to finish before months end. I had "Harvey" on the top of the list but won't check it off until it's quilted and bound. I posted a picture of that earlier in the week. Today I caught up with my "Red Letter Day" project, that was
just 1 block but I did 3. I figured if I was cutting 1 I might as well cut 3. I have 5 more to go.
Next on the list was 8 X & + blocks. I did 8 for me and 8 for my friend Jean. We'll swap them out later in the month.
I need to catch up with this week's Alphabet Blocks with Temecula Quilt Co and 1 Moda Designer block and my list is completed. Not too bad for it only being the 10th of the month!

I'll do more sewing today but first I think the teapot is calling my name.....
the blocks look great for both projects, they both have been on my radar to make! on that ever growing list. YOu certainly get a lot done each day, inspiring to us!
ReplyDeleteKathie
Great job! I especially like the Red Letter Day blocks.
ReplyDeleteYour red letter day blocks look great! I love the April Showers fabric. I just made a quilt with them. The navy Bonnie and Camille use is lovely.
ReplyDelete