Friday, October 10, 2014

Just Doing a Little Sewing

I'm not doing any major sewing today, just working on some monthly things I have on my Big 3 list.I make a list at the beginning of the month with at least 3 things that I need to finish before months end.  I had "Harvey" on the top of the list but won't check it off until it's quilted and bound.  I posted a picture of that earlier in the week.  Today I caught up with my "Red Letter Day" project, that was
just 1 block but I did 3.  I figured if I was cutting 1 I might as well cut 3.  I have 5 more to go.

Next on the list was 8  X & + blocks.  I did 8 for me and 8 for my friend Jean.  We'll swap them out later in the month.

I need to catch up with this week's Alphabet Blocks with Temecula Quilt Co and 1 Moda Designer block and my list is completed.  Not too bad for it only being the 10th of the month!
I'll do more sewing today but first I think the teapot is calling my name.....

3 comments:

antique quilter said...

the blocks look great for both projects, they both have been on my radar to make! on that ever growing list. YOu certainly get a lot done each day, inspiring to us!
Kathie

The Other Barb said...

Great job! I especially like the Red Letter Day blocks.

Sarah said...

Your red letter day blocks look great! I love the April Showers fabric. I just made a quilt with them. The navy Bonnie and Camille use is lovely.